MC MINING LIMITED - Activities Report for the quarter ended 31 March 2026 (FY2026 Q3) for MC Mining Limited and its Subsidiary Companies

Release Date: 30/04/2026 10:00
Code(s): MCZ     PDF:  
Wrap Text
Activities Report for the quarter ended 31 March 2026 (FY2026 Q3) for MC Mining Limited and its Subsidiary Companies

MC Mining Limited
Previously Coal of Africa Limited
(Incorporated and registered in Australia)
Registration number ABN 008 905 388
ISIN AU000000MCM9
JSE share code: MCZ
ASX/AIM code: MCM


ANNOUNCEMENT                                                               

30 April 2026

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 MARCH 2026 (FY2026 Q3) FOR MC MINING LIMITED (MC Mining or the Company)
AND ITS SUBSIDIARY COMPANIES                           
                                    


HIGHLIGHTS

Operations

•     Health and safety performance improvement across the group remains a top priority, with the
      Company having operated with one lost time injury ("LTI") for the quarter. The Makhado
      steelmaking hard coking coal Project ("Makhado Project" or "Makhado") had one LTI for the
      quarter, whilst Uitkomst Colliery ("Uitkomst Colliery" or "Uitkomst") had no LTIs for the quarter;

•     Key milestones achieved on the development of the Makhado Project:

          o   commissioning activities and start-up of the coal handling and preparation plant ("CHPP"
              or "Coal Plant") are scheduled for May 2026;

          o   the mining of overburden material from the open cast pit is on track with run-of-mine
              (ROM) delivery to the CHPP having started and coal faces exposed and ready to continue
            during commissioning and operation. ROM stockpiles are being built in preparation for
            the CHPP commissioning;

        o   construction of the Coal Plant is scheduled for completion in May 2026; and

        o   commissioning of the 14km overhead power transmission line is scheduled for April 2026;

•   The board of directors approved the temporary suspension of mining and processing operations
    at Uitkomst Colliery, with an effective date of 1 March 2026. During this period, the Company is
    evaluating strategic options aimed at unlocking value and preserving future optionality. These
    evaluations may include engagement with interested third parties regarding potential
    partnerships, joint operations or other strategic arrangements in respect of Uitkomst. No
    decisions have been taken, and any transaction would be subject to customary approvals. In
    addition, the Company continues to review its asset base with a view to disposing of redundant
    or non-core items where appropriate

•   Comprehensive evaluations of geological and mine planning information relating to the
    Company's Vele Aluwani semi-soft coking coal ("SSCC") and thermal coal ("TC") Colliery ("Vele
    Colliery" or "Vele") are still ongoing; and

•   TC prices continued with average prices of US$99/t for the three months, compared to US$86/t
    in Q2 FY2026 and US$96/t in Q3 of FY2025. Premium steelmaking HCC prices have increased,
    averaging US$231/t in the quarter compared to US$186/t in FY2025 Q3.

Corporate

• Available cash and facilities was US$5.4 million at the period end (FY2026 Q2: US$2.9 million);

• Kinetic Development Group Limited (KDG) made payments amounting to US$19 million for the
    purchase of MC Mining shares, as part of the share subscription agreement, during the quarter.
    US$3 million payment relates to the sixth Second Closing, US$10 million payment relates to the
    seventh Second Closing and US$6 million payment relates to the eighth Second Closing as per the
    Share Subscription Agreement;
• The Company made a further repayment of ZAR20 million towards the Industrial Development
   Corporation (IDC) loan during the quarter;

Events subsequent to the end of the quarter

KDG made payments amounting to US$6 million for the purchase of MC Mining shares, as part of the
share subscription agreement, during April 2026. The US$6 million payment relates to the final Second
Closing as per the Share Subscription Agreement. KDG has a 51% shareholding of MC Mining after the
US$6 million that was paid in April 2026.


DETAILED QUARTERLY OPERATIONS REPORTS

Makhado HCC Project – Soutpansberg Coalfield, Limpopo Province, South Africa (67% owned)


Project Overview. Construction of the Makhado steelmaking hard coking coal Project ("Makhado
Project" or "Makhado") progressed well, with hot commissioning activities and start-up of the Coal
Plant scheduled during May 2026. Project delays were largely attributed to inclement weather and
delays in commissioning of the Eskom power supply line.          During the quarter, more project
development milestones were successfully achieved, whilst maintaining regulatory compliance
performance that have become a recognizable feature of the venture to date. The colliery will be
South Africa's largest hard coking coal (HCC) producer, designed to produce 800,000 tonnes a year of
HCC 64 Mid Vol, once steady-state operation for the foundation phase is reached. The life-of-mine
(LOM) for the Makhado Colliery is planned to be 28 years. Contiguous to the Makhado Project are the
satellite Greater Soutpansberg Projects (GSP), that are all at granted Mining Right status, also
endowed with steelmaking HCC potential, and scheduled to be the focus of mine planning, once the
Makhado Project is commissioned.


Health, Safety, Regulatory Compliance and Environmental Performance. The Makhado Project had
one LTI for the quarter. Employee health initiatives focused on raising awareness on mental health,
men's health and chronic conditions management. The workforce onsite peaked at 977 people during
the quarter with the host community well-represented in the labour complement and support
services.


The mine continued to be built with zero reportable environmental incidents and keen emphasis being
placed on environmental protection and management. The Department of Mineral and Petroleum
Resources (DMPR) undertook a comprehensive and multi-discipline onsite health and safety,
environmental, social and labour planning and regulatory compliance audit of the Makhado Project.
The Company continues to promote collaborative and constructive relationships with regulatory
authorities and host community stakeholders.


Project Development Milestones Achieved. Following the heavy rainfall at the start of the quarter,
the Makhado Project has rebounded, with flooding subsiding and construction activities regaining
momentum. Flood damage to the temporary bridge was severe and, as such, it has been taken out of
use and the main access bridge opened to traffic. Work is continuing well on the Coal Handling and
Processing Plant ("CHPP") and the team has begun with cold commissioning of completed
areas. Noteworthy features of the project include:


    -   Open pit Mining: – The mining of overburden material from the open cast pit is in progress
        and on track for run of mine delivery to the CHPP startup. JCI Mining (Pty) Ltd ("JCI"), the
        principal mining contractor, now has 249 people on site, with a mining fleet consisting of 8
        backhoe configured excavators, supported by a team of 33 articulated dump trucks. Mining
        of overburden material is progressing steadily, with over 1.3 million bench cubic metres (BCM)
        already mined.
    -   Construction of the Coal Plant: – The CHPP construction works are progressing well with
        planned completion being Q2 2026. The construction works were largely completed and cold
        commissioning of the plant is under way. Hot commissioning and plant start-up is scheduled
        for May 2026. The CHPP will process ROM coal to produce a primary product of HCC 64 Mid
        Vol and a secondary product of 5,500kcal thermal coal ("TC"). Work is continuing on the
        planning of the expansion strategy once the foundation phase is commissioned.
        Environmental and Process Technologies (Enprotec), the lead contractors for building the Coal
        Plant, peaked at a staff compliment of 450 persons on site, across 16 different sub-
        contractors, with 140 of these employees having been recruited from the host communities.
    -   Construction of permanent access bridge: - The mine access road bridge across the Mutamba
        River is commissioned and in service, with works now focused on upgrading the approach
        roads providing site access.
    -   Construction power reticulation: –The main power supply line construction has progressed
        well and commissioning of the Eskom point of supply scheduled in April 2026. The installation
        of the MV Substation and transformers completed marks a significant milestone in the
        development of the power supply infrastructure. This power line, the Paradise Overhead Line
        (OHL), is a new a 14km long, 22kV bulk power transmission line, to deliver 7.5MVA of power
        to the site from the national grid, via the nearby Paradise Power Station. This workstream is
        managed by the EHL Engineering Group (EHL) on an EPC-turnkey basis.


Outlook. Construction work and operational readiness activities are ongoing, with hot commissioning
activities and start-up of the Coal Plant expected to commence during May 2026.


Uitkomst Colliery – Utrecht Coalfields, KwaZulu Natal Province, South Africa (84% owned)


The board of directors approved the temporary suspension of mining and processing operations at
Uitkomst Colliery, with an effective date of 1 March 2026.


The decision follows continued operational underperformance and cash losses experienced at the
operation. The suspension is intended to be a care and maintenance measure and does not represent
a permanent closure of the mine, a relinquishment of the mining right, nor a decision to place the
operation into liquidation or business rescue.
During this period, the Company is evaluating strategic options aimed at unlocking value and
preserving future optionality.


These evaluations may include engagement with interested third parties regarding potential
partnerships, joint operations or other strategic arrangements in respect of Uitkomst. No decisions
have been taken, and any transaction would be subject to customary approvals.


In addition, the Company continues to review its asset base with a view to disposing of redundant or
non-core items where appropriate.


Health, Safety and Environmental Performance. Uitkomst Colliery had a quarter free of reportable
environmental incidents and no LTI (FY2026 Q2: One LTI).


Vele Aluwani SSCC and TC Colliery – Limpopo (Tuli) Coalfield (100% owned)


Operations at Vele remain suspended, pending the conclusion of a re-engineered business plan. Work
continues on investigating a commercially viable logistics solution for the coal products to come from
the colliery. Vele recorded no LTIs (FY2026 Q2: nil) during the quarter.


Greater Soutpansberg Projects (GSP) – Soutpansberg Coalfield (74% owned)

The GSP recorded no LTIs (FY2026 Q2: nil) during the quarter. The GSP are a group of mineral
tenements, held as Mining Rights and satellite to the Makhado Project. Work has commenced on
assessing and prioritising the various tenements, as part of developing the future pipeline of
steelmaking HCC prospects to supplement the Makhado Colliery production. Negotiations were
progressed with respect to securing surface land access for prioritised deposits. The work required to
obtain environmental and water use licences for the Mining Rights are expected to commence during
Q4 FY2026.
Appendix 5B – Quarterly Cash Flow Report

The Company's available cash balance and facilities as at 31 March 2026 was US$5.4 million. The
aggregate amount of payments to related parties and their associates, disclosed as item 6.1 of the
March 2026 quarter Appendix 5B, was US$84k, comprising executive and non-executive director
remuneration.

Christine He

Managing Director and Chief Executive Officer

This announcement has been approved by the Company's Disclosure Committee.

All figures are in South African rand or United States dollars unless otherwise stated.



For more information contact:

    Bill Pavlovski                    Company                  Vision Corporate           bill.pavlovski@mcmining.co.za
                                      Secretary                (Pty) Ltd

    Company advisers:




    BSM Sponsors Proprietary Limited is the nominated JSE Sponsor




       A copy of the Appendix 5B can be found here:
       https://senspdf.jse.co.za/documents/2026/jse/isse/mcze/app_5b.pdf

       About MC Mining Limited:

       MC Mining is an ASX/JSE-listed coal exploration, development and mining company operating in South Africa. MC
       Mining's key projects include the Uitkomst Colliery (metallurgical and thermal coal), Makhado Project (hard coking
       coal), Vele Colliery (semi-soft coking and thermal coal), and the Greater Soutpansberg Projects (coking and thermal
       coal).

All figures are denominated in United States dollars unless otherwise stated. Safety metrics are compared to the
preceding quarter while financial and operational metrics are measured against the comparable period in the
previous financial year. A copy of this report is available on the Company's website, www.mcmining.co.za.

Forward-looking statements

This Announcement, including information included or incorporated by reference in this Announcement, may contain
"forward-looking statements" concerning MC Mining that are subject to risks and uncertainties. Generally, the words
"will", "may", "should", "continue", "believes", "expects", "intends", "anticipates" or similar expressions identify
forward-looking statements. These forward-looking statements involve risks and uncertainties that could cause
actual results to differ materially from those expressed in the forward-looking statements. Many of these risks and
uncertainties relate to factors that are beyond MC Mining's ability to control or estimate precisely, such as future
market conditions, changes in regulatory environment and the behaviour of other market participants. MC Mining
cannot give any assurance that such forward-looking statements will prove to have been correct. The reader is
cautioned not to place undue reliance on these forward-looking statements. MC Mining assumes no obligation and
does not undertake any obligation to update or revise publicly any of the forward-looking statements set out herein,
whether as a result of new information, future events or otherwise, except to the extent legally required.

Statements of intention

Statements of intention are statements of current intentions only, which may change as new information becomes
available or circumstances change.
Tenements held by MC Mining and its Controlled Entities

                                                                                Change
 Project                                                                          during
    Name         Tenement Number                          Location   Interest    quarter

 Chapudi         Albert 686 MS                            Limpopo~    74%
 Project*
                 Bergwater 712 MS                                     74%

                 Remaining Extent and Portion 2 of                    74%
                   Bergwater 697 MS

                 Blackstone Edge 705 MS                               74%

                 Remaining Extent & Portion 1 of                      74%
                   Bluebell 480 MS

                 Remaining Extent & Portion 1 of                      74%
                   Bushy Rise 702 MS

                 Castle Koppies 652 MS                                74%

                 Chapudi 752 MS                                       74%

                 Remaining Extent, Portions 1, 3 & 4                  74%
                   of Coniston 699 MS

                 Driehoek 631 MS                                      74%

                 Remaining Extent of Dorps-rivier                     74%
                   696 MS

                 Enfield 512 MS (consolidation of                     74%
                    Remaining Extent of Enfield 474
                    MS, Brosdoorn 682 MS &
                    Remaining Extent of Grootvlei
                    684 MS)

                 Remaining Extent and Portion 1 of                    74%

                 Grootboomen 476 MS                                   74%
                                                                     Change
Project                                                                during
   Name   Tenement Number                      Location   Interest    quarter

          Grootvlei 684 MS                                 74%

          Kalkbult 709 MS                                  74%

          Remaining Extent, Remaining                      74%
            Extent of Portion 2, Remaining
            Extent of Portion 3, Portions 1,
            4, 5, 6, 7 & 8 of Kliprivier 692
            MS

          Remaining Extent of Koodoobult                   74%
            664 MS

          Koschade 657 MS (Was Mapani Kop                  74%
             656 MS)

          Malapchani 659 MS                                74%

          Mapani Ridge 660 MS                              74%

          Melrose 469 MS                                   74%

          Middelfontein 683 MS                             74%

          Mountain View 706 MS                             74%

          M'tamba Vlei 654 MS                              74%

          Remaining Extent & Portion 1 of                  74%
            Pienaar 635 MS

          Remaining Extent & Portion 1 of                  74%
            Prince's Hill 704 MS

          Qualipan 655 MS                                  74%

          Queensdale 707 MS                                74%

          Remaining Extent & Portion 1 of                  74%
            Ridge End 662 MS

          Remaining Extent & Portion 1 of                  74%
            Rochdale 700 MS
                                                                         Change
Project                                                                    during
   Name   Tenement Number                      Location      Interest     quarter

          Sandilands 708 MS                                    74%

          Portions 1 & 2 of Sandpan 687 MS                     74%

          Sandstone Edge 658 MS                                74%

          Remaining Extent of Portions 2 & 3                   74%
            of Sterkstroom 689 MS

          Sutherland 693 MS                                    74%

          Remaining Extent & Portion 1 of                      74%
            Varkfontein 671 MS

          Remaining Extent, Portion 2,                         74%
            Remaining Extent of Portion 1 of
            Vastval 477 MS

          Vleifontein 691 MS                                   74%

          Ptn 3, 4, 5 & 6 of Waterpoort 695                    74%
             MS

          Wildebeesthoek 661 MS                                74%

          Woodlands 701 MS                                     74%

Kanowna   M27/41                               Coolgardie^   Royalty<>
West &
          M27/47                                             Royalty<>
Kalbara
          M27/59                                             Royalty<>

          M27/72,27/73                                       Royalty<>

          M27/114                                            Royalty<>

          M27/196                                            Royalty<>

          M27/181                                             5.99%

          M27/414,27/415                                     Royalty<>

          P27/1826-1829                                      Royalty<>
                                                                          Change
Project                                                                     during
   Name      Tenement Number                      Location    Interest     quarter

             P27/1830-1842                                    Royalty<>

             P27/1887                                         Royalty<>

Abbotshall   ML63/409,410                         Norseman^    Royalty
Royalty

Kookynie     ML40/061                             Leonora^     Royalty
Royalty
             ML40/135,136                                      Royalty

Makhado      Fripp 645 MS                         Limpopo~      67%#
Project
             Lukin 643 MS                                       67%#

             Mutamba 668 MS                                     67%#

             Salaita 188 MT                                     67%#

             Tanga 849 MS                                       67%#

             Daru 889 MS                                        67%#

             Windhoek 900 MS                                    67%#

Generaal     Beck 568 MS                          Limpopo~      74%
Project*
             Bekaf 650 MS                                       74%

             Remaining Extent & Portion 1 of                    74%
               Boas 642 MS-

             Chase 576 MS                                       74%

             Coen Britz 646 MS                                  74%

             Fanie 578 MS                                       74%

             Portions 1, 2 and Remaining Extent                 74%
                of Generaal 587 MS

             Joffre 584 MS                                      74%

             Juliana 647 MS                                     74%

             Kleinenberg 636 MS                                 74%
                                                                       Change
Project                                                                  during
   Name    Tenement Number                       Location   Interest    quarter

           Remaining Extent of Maseri Pan                    74%
             520 MS

           Remaining Extent and Portion 2 of                 100%
             Mount Stuart 153 MT

           Nakab 184 MT                                      100%

           Phantom 640 MS                                    74%

           Riet 182 MT                                       100%

           Rissik 637 MS                                     100%

           Schuitdrift 179 MT                                100%

           Septimus 156 MT                                   100%

           Solitude 111 MT                                   74%

           Stayt 183 MT                                      100%

           Remaining Extent & Portion 1 of                   100%
             Terblanche 155 MT

           Van Deventer 641 MS                               74%

           Wildgoose 577 MS                                  74%

Mopane     Ancaster 501 MS                       Limpopo~    100%
Project*
           Banff 502 MS                                      74%

           Bierman 599 MS                                    74%

           Cavan 508 MS                                      100%

           Cohen 591 MS                                      100%

           Remaining Extent, Portions 1 & 2 of               74%
             Delft 499 MS

           Dreyer 526 MS                                     74%

           Remaining Extent of Du Toit 563 MS                74%
                                                                         Change
Project                                                                    during
   Name   Tenement Number                          Location   Interest    quarter

          Faure 562 MS                                         74%

          Remaining Extent and Portion 1 of                    74%
            Goosen 530 MS

          Hermanus 533 MS                                      74%

          Jutland 536 MS                                       100%

          Krige 495 MS                                         74%

          Mons 557 MS                                          100%

          Remaining Extent of Otto 560 MS                      74%
            (Now Honeymoon)

          Remaining Extent & Portion 1 of                      74%
            Pretorius 531 MS

          Schalk 542 MS                                        74%

          Stubbs 558 MS                                        100%

          Ursa Minor 551 MS                                    74%

          Van Heerden 519 MS                                   74%

          Portions 1, 3, 4, 5, 6, 7, 8, 9,                     74%
             Remaining Extent of Portion 10,
             Portions 13, 14, 15, 16, 17, 18,
             19, 20, 21, 22, 23, 24, 26, 27, 29,
             30, 35, 36, 37, 38, 39, 40, 41, 44,
             45, 46, 48, 49, 50, 51, 52 & 54 of
             Vera 815 MS

          Remaining Extent of Verdun 535                       74%
            MS

          Voorburg 503 MS                                      100%

          Scheveningen 500 MS                                  74%
                                                                         Change
Project                                                                    during
   Name     Tenement Number                        Location   Interest    quarter

Uitkomst    Portion 3 (of 2) of Kweekspruit No.    KwaZulu-    84%
Colliery       22                                    Natal~
and
prospects   Portion 8 (of 1) of Kweekspruit No.                84%
               22

            Remainder of Portion 1 of Uitkomst                 84%
              No. 95

            Portion 5 (of 2) of Uitkomst No. 95                84%

            Remainder Portion1 of Vaalbank                     84%
              No. 103

            Portion 4 (of 1) of Vaalbank No. 103               84%

            Portion 5 (of 1) of Vaalbank No. 103               84%

            Remainder of Portion 1 of                          84%
              Rustverwacht No. 151

            Remainder of Portion 2 of                          84%
              Rustverwacht No. 151

            Remainder of Portion 3 (of 1) of                   84%
              Rustverwacht No. 151

            Portion 4 (of 1) Rustverwacht                      84%
               No.151

            Portion 5 (of 1) Rustverwacht No.                  84%
               151

            Remainder of Portion 6 (of 1) of                   84%
              Rustverwacht No. 151

            Portion 7 (of 1) of Rustverwacht No.               84%
               151
                                                                       Change
Project                                                                  during
   Name   Tenement Number                        Location   Interest    quarter

          Portion 8 (of 2) of Rustverwacht No.               84%
             151

          Remainder of Portion 9 (of 2) of                   84%
            Rustverwacht No. 151

          Portion 11 (of 6) of Rustverwacht                  84%
             No. 151

          Portion 12 (of 9) of Rustverwacht                  84%
             No. 151

          Portion 13 (of 2) of Rustverwacht                  84%
             No. 151

          Portion 14 (of 2) of Rustverwacht                  84%
             No. 151

          Portion 15 (of 3) of Rustverwacht                  84%
             No. 151

          Portion 16 (of 3) of Rustverwacht                  84%
             No. 151

          Portion 17 (of 2) of Rustverwacht                  84%
             No. 151

          Portion 18 (of 3) of Waterval No.                  84%
             157

          Remainder of Portion 1 of Klipspruit               84%
            No. 178

          Remainder of Portion 4 of Klipspruit               84%
            No. 178

          Remainder of Portion 5 of Klipspruit               84%
            No. 178
                                                                       Change
Project                                                                  during
   Name   Tenement Number                        Location   Interest    quarter

          Portion 6 of Klipspruit No. 178                    84%

          Portion 7 (of 1) of Klipspruit No.                 84%
             178

          Portion 8 (of 1 )of Klipspruit No.                 84%
             178

          Portion 9 of Klipspruit No. 178                    84%

          Remainder of Portion 10 (of 5) of                  84%
            Klipspruit No. 178

          Portion 11 (of 5) of Klipspruit No.                84%
             178

          Portion 13 (of 4) of Klipspruit No.                84%
             178

          Remainder of Portion 14 of                         84%
            Klipspruit No. 178

          Portion 16 (of 14) of Klipspruit No.               84%
             178

          Portion 18 of Klipspruit No. 178                   84%

          Portion 23 of Klipspruit No. 178                   84%

          Remainder of Portion 1 of                          84%
            Jackalsdraai No. 299

          Remainder of Jericho B No. 400                     84%

          Portion 1 of Jericho B No. 400                     84%

          Portion 2 of Jericho B No. 400                     84%

          Portion 3 of Jericho B No. 400                     84%
                                                                                              Change
    Project                                                                                     during
       Name        Tenement Number                         Location          Interest          quarter

                   Remainder of Jericho C No. 413                              84%

                   Portion 1 of Jericho C No. 413                              84%

                   Remainder of Portion 1 of Jericho A                         84%
                     No. 414

                   Remainder of Portion 2 (of 1) of                            84%
                     Jericho A No. 414

                   Portion 3 (of 1) of Jericho A No. 414                       84%

                   Portion 4 (of 1) of Jericho A No. 414                       84%

                   Portion 5 (of 2) of Jericho A No. 414                       84%

                   Portion 6 (of 1) of Jericho A No. 414                       84%

                   Margin No. 420                                              84%

    Vele           Portions of Overvlakte 125 MS           Limpopo~            100%
    Colliery          (Remaining Extent, 3, 4, 5, 6, 13,
    and               14)
    prospects
                   Bergen Op Zoom 124 MS                                       100%

                   Semple 155 MS                                               100%

                   Voorspoed 836 MS                                            100%

                   Alyth 837 MS                                                100%

* Form part of the Greater Soutpansberg Projects

~ Tenement located in the Republic of South Africa

^ Tenement located in Australia
#
     MC Mining's interest will reduce to 67% on completion of the 26% Broad Based Black Economic
     Empowerment (BBBEE) transaction

<> net smelter royalty of 0.5%

Date: 30-04-2026 10:00:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.